โ€” Portfolio Projects

Engineering the Energy Landscape.

Our portfolio spans complex industrial infrastructure across Indonesia, from high-pressure piping systems to strategic drilling logistics and civil ground works.

โ‡… Sort by Newest
Construction of 2 Pipelines From Cluster TLG-3 to Cluster KRH-6 & KRH 6 to KRH 4
Val. Rp 25.451.296.490
MECHANICAL & PIPING

Construction of 2 Pipelines From Cluster TLG-3 to Cluster KRH-6 & KRH 6 to KRH 4

Konstruksi perpipaan steam 2 fase geothermal (pekerjaan rekayasa) pada medan alam yang menantang.

๐Ÿ“Pertamina Geothermal Karahabodas, Jawa Barat
Road Improvement From Jayanegara To Parungkuda
Val. Rp 13.570.000.000
INFRASTRUCTURE

Road Improvement From Jayanegara To Parungkuda

Perbaikan jalan dan saluran sepanjang 25 km dengan manajemen lalu lintas yang kompleks.

๐Ÿ“Jayanegara - Parungkuda
Provision Of HDPE Condensate Pipeline Services Phase-2
Val. USD 485,000
MECHANICAL & PIPING

Provision Of HDPE Condensate Pipeline Services Phase-2

Supply and Install HDPE Pipeline 12โ€ณ for Brain Water from Power Plant to Injection Well.

๐Ÿ“Star Energy Geothermal (Wayang Windu) Limited
Provision Of HDPE Condensate Pipeline Services
Val. USD 313,453
MECHANICAL & PIPING

Provision Of HDPE Condensate Pipeline Services

Supply and Install HDPE Pipeline 12โ€ณ for Brain Water from Power Plant to Injection Well (Phase 1).

๐Ÿ“Star Energy Geothermal (Wayang Windu) Limited
Provision Of Permanent Pipeline Installation Services
Val. USD 1,420,737
MECHANICAL & PIPING

Provision Of Permanent Pipeline Installation Services

Konstruksi perpipaan permanen untuk minyak, gas, dan fasilitas geothermal.

๐Ÿ“Star Energy Geothermal (Wayang Windu) Limited
PCV Debottlenecking
Val. Rp 5.363.958.335
MECHANICAL & PIPING

PCV Debottlenecking

Fabricate & Install Pipe Support & Welding Works, Mechanical, Piping, Hydrotest & Platform.

๐Ÿ“Tripatra Engineer & Construction
SF Steamline Stage 2 & 3
Val. Rp 831.131.715
MECHANICAL & PIPING

SF Steamline Stage 2 & 3

Fabricate & Install Main Pipeline 36โ€ณ dan Pipeline 42โ€ณ sejauh 250 Meter, termasuk Golden Joint.

๐Ÿ“Geothermal Fields
150+
Projects Completed
Nationwide
10M
Sqm Work Area
Across sites
32
Heavy Units
Equipment fleet
ISO
Certified Quality
3 Standards